'

R-Guard Installation Detail
Roof-To-Wall Transition – Parapet Wall Face

wood construction with plywood/OSB sheathing

Download this detail

R-Guard-Install-10.2-Roof-To-Wall-Transition--wood-construction-with-plywood

1.

Along the top edge of the non-vented parapet, apply FastFlash to the front face of sheathing and the structural member. Spread the wet product to create a seamless transition with the roofing membrane coming down the vertical face of the wall.

Ted Barnekoff - Air & Water Barriers, PROSOCO

Ted Barnekoff
Product Support - Air & Water Barriers

READY TO HELP

At Prosoco, real humans answer the phone, so why not give them a call?