'
R-Guard Installation Detail
Roof-To-Wall Transition – Parapet Wall Face
metal studs with gypsum sheathing/OSB sheathing/plywood
1.
Consolidate and seal any raw, cut gypsum board edges by brushing or spraying on a thin uniform coat of PorousPrep.
2.
Along the top edge of the non-vented parapet, apply FastFlash to the front face of sheathing and the structural member. Spread the wet product to create a seamless transition with the roofing membrane coming down the vertical face of the wall.
READY TO HELP
At Prosoco, real humans answer the phone, so why not give them a call?